3phaseee logo

    Login
    Sign Up
  • THEORY
  • MODELING  &  TOOLS
  • PSSE TUTORIALS
  • PYTHON
  • PSSE AUTOMATION
  • SHORT CIRCUIT
  • FAQ
  • Contact Us

MODELING and TOOLS

  • TLine, Gen, Xfmr Estimators
  • TLine, Gen, Xfmr Code Creators
  • Generation Plant Modeling
  • Cable Parameter Estimator
  • ----------------- TOOLS -----------------
  • Compensated Bus ΔV
  • Interpolation Calculator
  • Ferranti Calculator
  • Line Dropping Calculator
  • Long Line Model Calculator
  • Motor Starting Calculator
  • Parallel Xfmr Flow Calculator
  • Power Factor Calculator
  • Phase-Shifting Xfmr Power Flow
  • PST Flicker Calculator
  • PU - Physical Calculator
  • PU Base Change Calculator
  • Series Capacitor Voltage Rise
  • Series Line Compensation
  • SIL Calculator & St.Clair Plot (us)
  • SIL Calculator & St.Clair Plot (metric)
  • Two Bus Line Flow Calculator
  • Test Report Calculator (2W)
  • Test Report Calculator (3W)
  • Δ - T - Δ Converter (3W)
  • Xfmr Tap Calculator
  • Z-Y Converter

Shielded Underground Cable Estimator1

cable configuration screenshot

Spacing

Positive Sequence2

Zero Sequence3

Defaults Equations

1) These cable parameters are conceptual estimates and should not be used in production.

2) Positive sequence parameters use basic assumptions and simplified equations.
    The cable manufacturer or vendor would provide these values based on installation specifics.

3) Zero sequence parameters use basic assumptions and simplified equations, likely with large error.
    Do Not use these in production for system protection settings!
    The cable manufacturer or vendor might provide good estimates based on installation specifics.
    Field measurements based on fault data are really required to accurately calculate zero sequence parameters.